• Gold Forging Undercarriage Parts Front Idler Asssembly for Bulldozer D155 D7g D7r D7h
  • Gold Forging Undercarriage Parts Front Idler Asssembly for Bulldozer D155 D7g D7r D7h
  • Gold Forging Undercarriage Parts Front Idler Asssembly for Bulldozer D155 D7g D7r D7h
  • Gold Forging Undercarriage Parts Front Idler Asssembly for Bulldozer D155 D7g D7r D7h
  • Gold Forging Undercarriage Parts Front Idler Asssembly for Bulldozer D155 D7g D7r D7h
  • Gold Forging Undercarriage Parts Front Idler Asssembly for Bulldozer D155 D7g D7r D7h

Gold Forging Undercarriage Parts Front Idler Asssembly for Bulldozer D155 D7g D7r D7h

Certification: ISO9001: 2000
Condition: New
Product Type: Front Idler Assembly
Samples:
US$ 0/Piece 1 Piece(Min.Order)
| Order Sample
Customization:
Shipping Cost:

Estimated freight per unit.

about shipping cost and estimated delivery time.
Payment Method: visa mastercard discover JCB diners club american express T/T
  Initial Payment Full Payment
Currency: US$
Return&refunds: You can apply for a refund up to 30 days after receipt of the products.
From payment to delivery, we protect your trading.
Gold Forging Undercarriage Parts Front Idler Asssembly for Bulldozer D155 D7g D7r D7h pictures & photos
Gold Forging Undercarriage Parts Front Idler Asssembly for Bulldozer D155 D7g D7r D7h
US $30-300 / Piece
Min. Order: 1 Piece
Diamond Member Since 2021

Suppliers with verified business licenses

Secured Trading Service
Manufacturer/Factory
  • Overview
  • Product Description
  • Product Parameters
  • Dozer Excavator Part No.
  • Main Feature
  • Company Profile
  • Packaging & Shipping
  • FAQ
Overview

Basic Info.

Model NO.
Idler
Machine Model
Crawler Bulldozer
Machine Type
Crawler Excavator
Product
Bulldozer Excavator Front Idler Assy
Related Product
Track Roller/Carrier Roller /Front Idler Assy
Related Products
Track Link and Shoes/Sprocket and Segment
Color
Yellow, Black or Customized
Service
OEM ODM
Test Report
Provided
Hardness
HRC52-58, Depth: 8-12mm
Process
Casting/Forging
Deliver Time
7-20 Days After Contrast Established
Advantage
Good Mechanical Properties
Working Condition
Construction and Leveling of Dumping Sites
Finish
Smooth
Transport Package
According to Customer Requirements
Specification
Base on drawing
Trademark
Gold Forging
Origin
Xiamen, China
HS Code
8431499900
Production Capacity
30000PCS /Month

Packaging & Delivery

Package Size
1.00cm * 1.00cm * 1.00cm
Package Gross Weight
1.000kg

Product Description

Cralwer Excavator Front Idler Assembly

Product Description

Product: Front Idler
Material: 35MnB/40Mn2
Production Process: Casting/Forging
Surface Hardness: HRC52-58
Color: Black, Yellow or Customized 
Compatible Machine:  Excavator/Bulldozer 
Certification: ISO9001
Deliver time:  7-15 days after contrast established 
Offer customized Service : Yes 


Gold Forging Undercarriage Parts Front Idler Asssembly for Bulldozer D155 D7g D7r D7h

Product Parameters

Gold Forging Undercarriage Parts Front Idler Asssembly for Bulldozer D155 D7g D7r D7h


The idler, which is also called idler group, idler assy, front idler or idler wheel, is one part of undercarriage parts for crawler heavy equipments such as excavator, bulldozer, crane, drilling machine etc. It is made of idler shell, shaft, O-ring, bi-metallic bushing bronze and seal group.

 

Dozer Excavator Part No.

Cate D4D,D4H,D5G,D5H,D7,D7G,D8N,E307,E100B,E120B,E200B, etc.
Komatsu PC40,PC60,PC75,PC100-5,PC120-5,PC130,PC200-3,PC200-5, etc.
Hitachi EX40-3,EX100-1,EX120-1,EX150-1,EX200-5,EX300-1,EX400-1, etc.
Daewoo DH55,DH220,DH258,DH300-5, etc.
Kobelco  SK100,SK120-3,SK200,SK320, etc.
Hyundai R55-7,R60-7,R70LC-7,R200,R200LC,R250,R290-3, etc.
Volvo EC210,EC240,EC290, etc.
Yanmar VIO17,VIO20,VIO30,VIO55,VIO50-5,VIO80, etc.
PS: The models above are just for reference, we can't list all models here. We can supply more products as your requirements. Please feel 

Gold Forging Undercarriage Parts Front Idler Asssembly for Bulldozer D155 D7g D7r D7h
 

Main Feature

  1. Through quench-tempering processes to ensure excellent mechanical properties, high strength and superior wear resistance to bending and breakage.
  2. Advanced automatic machining center, ensure the accuracy of assembly dimensions. 
  3. Automatic welding robot makes sure goods have steady and good welding quality.
  4. We can also produce any requested parts according to your blue print or samples.



Gold Forging Undercarriage Parts Front Idler Asssembly for Bulldozer D155 D7g D7r D7h


 

Gold Forging Undercarriage Parts Front Idler Asssembly for Bulldozer D155 D7g D7r D7h




Gold Forging Undercarriage Parts Front Idler Asssembly for Bulldozer D155 D7g D7r D7h
 

Company Profile


Establised in 2007, Gold Forging always insist on quality first, service first, continuously introduce new equipment, improve products quanlity and increase production capacity.
Among them, forged bucket teeth, as one of the main products of Gold Forging, can match most brands on the market, and the R&D department is also committed to developing new bucket teeth to adapt to different brands of excavators, such as Caterpillar, Komatsu, Volvo, and mini excavators, etc.

Gold Forging Undercarriage Parts Front Idler Asssembly for Bulldozer D155 D7g D7r D7h
Gold Forging Undercarriage Parts Front Idler Asssembly for Bulldozer D155 D7g D7r D7h
 

Packaging & Shipping

Gold Forging Undercarriage Parts Front Idler Asssembly for Bulldozer D155 D7g D7r D7h

Gold Forging Undercarriage Parts Front Idler Asssembly for Bulldozer D155 D7g D7r D7h
 

FAQ


1. You are a trader or a manufacture?
We are an industry and trade integration business, our factory located in Quanzhou ,and our sales department is in City centre of Xiamen.

2. How can I be sure the part will fit my excavator?
Give us correct model number/machine serial number/ any numbers on the parts itself. Or measure the parts give us dimension or drawing.

3. How about the payment terms?
We usually accept T/T or L/C. other terms also could be negotiated.

4. What is your minimum order?
It depends on what you are buying. Normally, we don't have MOQ request.

5. What is your delivery time?
If don't stock in factory : 20 days . If there are any parts in stock , our delivery time is only 0-7 days.

6. What about Quality Control?
We have a perfect QC system for the perfect products. A team who will detect the product quality and specification piece carefully, monitoring every production process until packing is complete, to ensure product safety into container.

7. Can offer the sample ?
For forged bucket teeth we can offer free sample, but the clients need bear the freight. 
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

From payment to delivery, we protect your trading.
Gold Forging Undercarriage Parts Front Idler Asssembly for Bulldozer D155 D7g D7r D7h pictures & photos
Gold Forging Undercarriage Parts Front Idler Asssembly for Bulldozer D155 D7g D7r D7h
US $30-300 / Piece
Min. Order: 1 Piece
Diamond Member Since 2021

Suppliers with verified business licenses

Secured Trading Service
Manufacturer/Factory
Registered Capital
5000000 RMB
Plant Area
30000 square meters